W.E.C. Engineers, Inc. designed and inspected the construction of approximately 4 miles of the 3rd lane widening project in both the eastbound and westbound lanes of the Ohio Turnpike. 

The major items of work for this project included:                                   

  • Grading
  • Draining
  • Asphaltic Concrete Lane
  • Shoulder Pavements
  • Bituminous Overlay at Existing Shoulders
  • Permanent Concrete Barrier                                            
  • Concrete
  • Retaining Wall
  • Installation of Traffic Control Devices
  • Safety Upgrading of Guardrails
  • Culvert Repair
  • Widening of a 4-span Steel Bridge over the Conrail Railroad
  • Widening of a 3-span Steel Bridge over the former Conrail & Newton Falls, Braceville and Robinson Road

 