top of page

Partial List of Roadway Projects

 

  • Annual CDBG Street Replacement / Rehabilitation Program, City of Monessen, PA: Yearly program to replace/rehabilitate approximately 2,000 feet of City streets for over fifty years.

  • Blueberry Hill Park Lane: Final design for the main and secondary entrances to Blueberry Hill Park including the Borough’s community center and athletic fields. Borough of Franklin Park, PA

  • Findlay Connector, Section 54B: Preliminary and final design for a new four lane limited expressway in Findlay Township for the Pennsylvania Turnpike Commission

  • Franklin-Woodlands Road: Preliminary and final design for the widening of 1.1 miles of Route 2 in Marshall County from two lanes to four lanes for the West Virginia Department of Transportation

  • Mon-Fayette Expressway, Section 53A: Preliminary and final design for the side roads realigned for the limited access highway between Elizabeth and Duquesne for the Pennsylvania Turnpike Commission

  • Mon-Fayette Expressway, Section 53H: Preliminary design for a portion of the limited access highway between North Braddock and Rankin for the Pennsylvania Turnpike Commission.

  • Mon-Valley Expressway: Corridor Location Study for a four-lane limited access highway between U.S. 40 in West Virginia to Brownsville, PA for the Pennsylvania Turnpike Commission

  • Mosside Boulevard Improvement Project: Final design for the Improvements to the intersection of Mosside Boulevard (SR 48) with Old William Penn Highway including upgrading traffic signals and widening for additional travel lanes and turning lanes in all directions. Municipality of Monroeville, PA

  • Addition of 3rd Lane on the Ohio Turnpike: Preliminary and final design for the widening of the Ohio Turnpike from two lanes to three lanes in each direction between milepost 205 and milepost 209 near Warren, OH for the Ohio Turnpike Commission

  • Venetia Road Bridge Replacement Project: Preliminary and final design for the widening of 1,200 feet of Venetia Road in Nottingham Township and Peters Township, PA for the Pennsylvania Department of Transportation.

  • U.S. Route 22 to I-79 Alternatives Study: Phase I alternative alignments and Phase 2 detailed alternative alignment development for the four-lane limited access Southern Beltway southwest of Pittsburgh for the Pennsylvania Turnpike Commission

bottom of page